As the pour was a couple of days away, molds had to be prepped removing patterns (object to cast), channels needed to be cut into the mold and a graphite coating was applied with a spray gun. Day of the pour, molds were placed and leveled in front of the furnace.
[supsystic-gallery id=13 position=center]